Calculate ownership cost across the events you realistically expect to attend. Keep purchase cost, graphic changes, transport and electricity separate so you can see what drives the comparison.
Compare an illuminated and unlit system against the same useful display requirement and number of events. Include essential hardware, cases, initial graphics, replacement graphics, delivery and any setup support.
Record each assumption and replace it with a quotation or measured input when available. A low purchase price can be outweighed by transport or replacement costs, but do not assume that outcome without calculating it.
| Component | Calculation |
|---|---|
| Hardware and initial graphic | Actual complete-kit quotation |
| Later graphics | Number of planned changes × quoted complete replacement cost |
| Transport | Planned trips × relevant incremental transport cost |
| Electricity | Input watts ÷ 1,000 × hours used × tariff per kWh |
| Event and support costs | Actual venue power charges and quoted service costs |
| Cost per event | Total planned ownership cost ÷ planned number of events |
For illustration only, a 120 W unit used for 24 hours consumes 2.88 kWh: 120 ÷ 1,000 × 24. At an assumed £0.30 per kWh, that is £0.864, or about £0.86. Neither the power nor tariff is a verified specification for a SignCo product. Venue connection charges are separate and may matter more than the electricity itself.
Compare VAT consistently according to how your organisation assesses costs. Include storage or handling where it differs between options. Avoid counting an event that is merely possible as guaranteed utilisation.
A cost calculation cannot prove an illuminated display generates more enquiries. If that benefit is central to the decision, define how it will be observed and compare event results cautiously.
Use the buying comparison for the qualitative decision and replacement planning for later graphics. Ask the supplier for the actual input rating and itemised kit costs, then use like-for-like scope checks on the quotations.
Use the specific unit’s input power, operating hours, tariff and venue charges.
Only use events included in a realistic plan and show the assumption.
Yes, when campaign or branding changes are expected.
It is one input. Suitability, presentation, handling and support also matter.
Ask for itemised hardware replacement graphic and support costs. Explore SignCo’s LED fabric lightboxes or contact the team.